The 7:30 morning meeting, in front of the TV screen
Illustrative exampleThe situation
A distribution centre starts the day with 3 runs before noon and 40 people on shift. The warehouse manager and the shift leads have ten minutes to see where the problem is.
The challenge
Without dashboards, the picture is pieced together from reports and phone calls: who is in which zone, what is left from yesterday, what is waiting at the dock. A problem is noticed only when a truck is waiting.
How it runs in NG WMS
- 1The TV screen rotates “Today and this shift” and “Risks and alerts”: orders at risk, goods at the dock, open replenishments.
- 2An insight shows that 3 orders for run 2 are not in a wave yet — the dispatcher releases them right after the meeting.
- 3“Shift live” shows 14 people picking and 5 checking — the shift lead moves two people to checking before the first run.
- 4At 10:00 “Waves live” shows one wave running late; the shift lead sees the zone it is stuck in and sends replenishment.
- 5At the end of the day “This week” compares deadlines and exceptions with last week.
Who does what
- Warehouse managerRuns the meeting on figures, not impressions.
- Shift leadMoves people according to the load they see live.
- DispatcherReleases waves according to the risks the dashboard singles out.
What you gain
Problems are solved before the truck, not after a complaint — and everyone on the shift looks at the same figures.
Features in this scenario
Illustrative example: the numbers are an example, the steps are the actual workflow in NG WMS.